Background

Background

Silahkan klik beberapa gambar di bawah ini

  • image1
  • image2
  • image3
  • image4
  • image2
  • image1
  • image4
  • image3
Step 1: Identify if weaknesses are present in the design
Is the Frame Relay WAN design able to scale to meet the expected growth?
Ya, layanan Frame Relay biasanya sangat terukur. CIR tambahan dapat dibeli dan sirkuit tambahan dapat ditambahkan jika diperlukan.

Do the results of the prototype test indicate that the Frame Relay configuration will work as expected?
Karena sebuah router bertindak sebagai saklar Frame Relay simulasi, tidak ada cara untuk menguji bandwidth dan kinerja Frame Relay nyata switched jaringan. Karena tidak mungkin untuk menguji kemampuan melalui jaringan Frame Relay TSP sebenarnya ada risiko yang berkaitan dengan desain.
Are there any weaknesses associated with using the VPN connections as backup to the Frame Relay WAN?
Walaupun pengujian memverifikasi bahwa fungsi Ethernet berbasis simulasi backup, ini tidak cukup mensimulasikan penggunaan link VPN sebagai link Fast Ethernet jauh lebih cepat daripada VPN khas. Daerah yang paling kritis risiko adalah kinerja dari link VPN sebagai backup dalam jaringan nyata. Apabila komponen suara dan video dari jaringan ditambahkan ke WAN lalu lintas yang ada, mungkin ada masalah kualitas layanan jika koneksi VPN harus digunakan. VPN arus melalui ISP tidak memiliki tingkat jaminan pelayanan. Selain itu, tidak memiliki mekanisme untuk menyediakan QoS. Akibatnya, link cadangan hanya bisa menyediakan konektivitas terbatas dalam hal kegagalan.

Will a failure of the primary link cause the FilmCompany to lose connectivity to the Stadium LAN?
Tidak, link backup dengan rute statis mengambang akan diaktifkan untuk menyediakan konektivitas ketika F primer / link R gagal.

Does the EIGRP authentication provide for a secure transmission of the routing updates?
Ya, meskipun penggunaan Pesan Digest 5 (MD5). Kombinasi kunci pengenal dan antarmuka yang terkait dengan pesan unik mengidentifikasi algoritma otentikasi dan kunci MD5 otentikasi digunakan.

Step 2: Determine what the risks are of not correcting the weaknesses
If, in Step 1, you identify weaknesses in the proposed design, what risks do these weaknesses present to
FilmCompany?
Risikonya adalah bahwa jaringan Frame Relay bawah beban aktual pengguna yang sebenarnya tidak akan melakukan serta link disimulasikan dalam prototipe. Juga, link VPN cadangan disimulasikan mungkin tidak bekerja seperti yang diharapkan dalam hal pemulihan menggunakan link VPN nyata bukan link FastEthernet simulasi. Penerimaan akhir dari desain mungkin harus menunggu sampai hasil instalasi pilot diketahui.

Step 3: Suggest ways that the design can be improved to reduce the risk
In what ways could the proposed design be improved to reduce the areas of risk?
Jika waktu dan uang mengizinkan, uji coba dapat dijalankan di mana sirkuit F/R sementara dengan CIR tertentu bisa dipasang dengan kerjasama layanan yang disediakan dan beban uji simulasi dapat dihasilkan pada berbagai waktu untuk memastikan kinerja di bawah tinggi -volume kondisi. Tingkat perjanjian layanan (SLA) juga bisa dinegosiasikan untuk menyediakan asuransi yang rangkaian akan bekerja seperti yang diharapkan selama periode beban puncak. Sehubungan dengan link backup VPN, pilot dapat termasuk penggunaan koneksi VPN aktual melalui link DSL ke lebih akurat menunjukkan kemampuan pemulihan dari desain yang diusulkan.

Step 4: Document the weaknesses and risks on the test plan
In the Results and Conclusions section of the test plan, record any weaknesses, risks, and suggested improvements.

Step 4: Reflection
Why do you think it is important to identify weaknesses and risks in the proposed design before presenting it to the customer? What are some reasons that weaknesses cannot be corrected?
Adalah penting untuk mengidentifikasi kelemahan dan risiko dalam desain yang diusulkan sebelum menyajikannya kepada pelanggan untuk memastikan bahwa pelanggan memahami keterbatasan prototipe dan tidak mengarah pada memiliki harapan yang tidak realistis berdasarkan prototipe. Mungkin tidak mungkin untuk mengimbangi semua kelemahan yang dapat diidentifikasi karena waktu, uang atau kendala personil. Risiko harus dianalisa dan seimbang terhadap variabel-variabel lainnya.
Task 1: Build the Network. Task Complete
Step 1 Connect devices
a. Connect the routers as shown in the topology diagram. Refer to the Test Plan in Lab 8.2.2 for cabling required.
b. For each of the routers to be configured, use the erase startup-config and the reload commands from the privileged EXEC prompt, to ensure that you are starting with a clean configuration.


Task 2: Configure Router ISPX as a Backup. Task Complete

Step 1: Perform basic configuration of the ISPX router
Connect a PC to the console port of the router to perform configurations using a terminal emulation program.
Configure the router with hostname, passwords, message-of-the–day, and no ip domain lookup.
Router(config)#hostname ISPX
ISPX(config)#line console 0
ISPX(config-line)#password cisco
ISPX(config-line)#login
ISPX(config-line)#exit
ISPX(config)#line vty 0 4
ISPX(config-line)#password cisco
ISPX(config-line)#login
ISPX(config-line)#exit
ISPX(config)#enable password cisco
ISPX(config)#enable secret class
ISPX(config)#no ip domain-lookup
ISPX(config)#banner motd #Unauthorized use prohibited#

Step 2: Configure ISPX router FastEthernet interfaces
Configure the FastEthernet interfaces for the backup links to the Edge2 and BR3 routers. Configure a description and the IP address, and activate each interface.

Step 3: Configure a static route on the ISPX router to the FilmCompany local network
On the ISPX router, configure a normal static route to the BR3 network 172.18.225.0/25 via the Fa0/0 interface on BR3.

Step 4: Configure a static route on the ISPX router to the stadium local network
On the ISPX router, configure a normal static route to the Edge2 network 172.18.3.0/24 via the Fa0/1 interface on Edge2.

Task 1: Review the Supporting Documentation

Step 1: Refer to the WAN Design Test Plan document provided for this lab
Download the WAN Design Test Plan. What is the purpose of this WAN design test? Which elements
of the design will be tested using this plan?
The purpose of this prototype is to demonstrate the use of Frame Relay WAN links to connect a remote site router to a central site router through a router that simulates a Frame Relay switch. Backup Ethernet links from the remote site and central site to a 4th router simulate a VPN backup capability and provide an alternate path in the event that one of the Frame Relay WAN links goes down.
a. Document the purpose of the test in the Introduction section of the WAN Design Test Plan.
b.Review the tests that will be run to validate the prototype.

Step 2: Review the equipment needed to perform the tests
Review the list of all equipment needed to build the prototype and to perform the tests. Be sure to include
cables, optional connectors or components, and software. If the recommended equipment is not available in your lab, discuss possible substitutes with your instructor and classmates, based on interface requirements of the topology.
a. If substitute equipment must be used, list the devices here:
b. Determine the amount of each type of cabling necessary to create the prototype test topology. Record the information on the Equipment chart in the WAN Design Test Plan.
c. Document any special configuration or cabling issues that might arise if substitute equipment is used.


Task 1: Identify areas of risk and weakness in the server farm implementation

Step 1: Analyze the physical topology
Examine the server farm topology as one entity and as a part of the entire FilmCompany topology. Look for each of the risks and weaknesses listed in the chart. Describe the devices, connections, and issues that you find, or record None found if the design appears to avoid risks in that area.
Weakness
Risk
Description of Location and Devices
Single point of failure
If a device fails, a portion of the network will be inoperable.

Large failure domain
If a device or link fails, a large portion of the network will be affected

Possible bottlenecks
If the traffic volume increases, there
is a potential for response time to
degrade.

Limited scalability
If the network grows more rapidly than expected, a costly upgrade will be needed.

Overly-complex design
If the design is too complex, the current staff will not be able to support it properly.

Other possible
weaknesses (specify):