Step 1: List the items required
a. Use the table below, or create a similar one, to list all the items and equipment that need to be purchased for the FilmCompany network upgrade project.
b. Search the Internet or use information provided by your instructor to add possible suppliers or vendors to the BOM table.
c. Add costs to the BOM. Where possible, obtain costs from local vendors and suppliers. If this information is not readily available, your instructor will provide estimated costs for you to use.

Step 2: Determine the software requirements
a. During the early stages of the network Design Phase, existing applications were identified. Add new applications required by the network upgrade to the BOM. Categorize these as either Network or Specialist applications.
b. Add the new applications, installation costs, and required training to the BOM with the identified hardware. Also indicate whether the network upgrade requires additional licenses to be purchased for existing software applications.

Step 3: Add maintenance contracts
a. Investigate the maintenance support service contracts available for both the new and existing equipment.
b. Add the details and costs to the BOM.

Step 4: Create the BOM
a. Create the BOM using word processing or spreadsheet software. Using a spreadsheet will facilitate the calculation of total costs and enable easy updating of the document if costs or quantities are amended.
b. Save this file and include it in the proposal document. Add a hardcopy of the file to your portfolio.
Step 1: List and prioritize the factors affecting the timeline
Note issues such as equipment and material availability, skilled personnel, and customer requirements that should be considered for the following factors when developing a project timeline. Consider the possibility that the project might not begin on the proposed start date.
Equipment order and delivery
Service installation, such as WAN links
Customer schedule, including available maintenance and downtime windows
Availability of appropriate technical personnel

Step 2: Complete the time details for each installation phase
The FilmCompany network upgrade is linked to the StadiumCompany network redevelopment. It would be efficient to align the FilmCompany stadium remote site work with that project. The StadiumCompany RFP states that the project must be completed during the off-season for the two teams. This requirement gives the project a timeline of four months, which can be also applied to the FilmCompany upgrade.
a. On the table created in Lab 9.2.1 for Phase 1, fill in the Date information:
  • Install Distribution and Core Layer equipment
  • Configure new IP addressing & VLAN scheme
  • Configure routing
b. On the table for Phase 2, fill in the Date information:
  • Upgrade the WAN connectivity
  • Extend the network to the remote site
  • Configure Access Control Lists & security
c. On the table for Phase 3, fill in the Date information:
  • Install and configure the wireless and associated mobility network equipment


Step 1: Compare the installation methods
There are three possible installation methods:
  • New installation, commonly referred to as a green field installation
  • Phased installation into an existing, functioning network
  • Complete replacement, commonly referred to as a fork-lift upgrade
Consider and list the advantages and disadvantages of the three installation methods.
New Installation

Advantages:
Semua peralatan dan layanan dapat diinstal dan diuji pada saat yang sama.
Rencana implementasi untuk jaringan baru kurang kompleks dibandingkan dengan dua jenis instalasi.
Jadwal lebih fleksibel daripada ketika jaringan yang ada di tempat.
Ada gangguan minimal terhadap perusahaan.
Disadvantages:
Modal besar karena semua peralatan dan layanan yang diinstal pada waktu yang sama.
Phased Installation into Existing Network